Pentadel Project Management is proud to have completed another project at Charlie Bigham’s award winning West Kitchen in Wells, Somerset.  

Pentadel undertook complex modifications to the existing facility whilst maintaining business-critical production without disruption.  

The Pentadel team designed and managed the installation of 15 tonnes of support, roof strengthening and access steel work – to facilitate the fitting of three 6.5 tonne de-odourising units, each measuring 38 cubic metres – in a confined and live ceiling void.  

A major challenge was presented by the ceiling void’s restricted access; this was overcome through the installation of an external 16-tonne crash deck. A new runner beam system will aid with future maintenance of the new units.

Crucially, the project was completed under budget and on schedule in December 2018, with no accidents and without any disruption to Bigham’s ongoing production operations.  

We instructed Pentadel to project manage the installation of an activated carbon filtration system within our live production kitchen. Pentadel was selected due to the complexity of the project and to ensure that the project works did not impact the production kitchen or our staff. I would highly recommended their services and look forward to working with them on our next project.
— Adam Webb, Head of Engineering, Charlie Bigham’s

Services provided by
Pentadel included:

  • Statement of Requirements

  • Concept Design and
    Cost Estimate

  • Detail Design and Procurement

  • Construction Management

  • Principal Designer
    (per CDM 2015)

  • Principal Contractor
    (per CDM 2015)